After-Opening-of-Southern-Expressway
A barrier provided for the house at Ch.62+810 to minimize dust impacts.
Sewerage removal from the worker’s accommodation at Ch. 49+500 (RHS) as per the conditions in the EPL
Introduced a solid wastes sorting system to worker’s accommodation. Ch. 49+500 (RHS)
Temporary Erosion control measures at Chainage - 12+500 LHS
Drainage Improvements at Chainage 1+600 LHS
Mainwaring Hydro-seeding at Chainage 13+200 RHS
Road at Chainage 30+400 Facing North
Chainage G 4+285 Facing Pinnaduwa
Sub Grade Preparation at Chainage 2+600 North View (JICA Package 1)
Aggregate Base Course at 4+500 North View (JICA Package 1)
Opening of Southern Expressway